Skip to content

Evaluation and Treatment of Pavement Deficiency

    Mamostaian Street has been selected as a case study.
    Length  of the street 3.75 Km and Width of one lane  3.6 m
    2-way divided 6-lane ,have 5 intersections

    Objectives of  the Project:
    Determine the type of deficiency in the road network
    Prepare a scientific solutions
    Prepare a booklet for municipality engineers

    This  project is the one projects of the city lab sulaimani performance by Directorates of Sulaimani  Municipality and Tourism , University of Sulaimani , Directorate of Traffic Police

    This project at the start about 15 volunteers have worked and till now about 670 hours has worked